Project Details

Civil Engineering / Capital Projects

Lagos-Ibadan Expressway Bridge Expansion

Donatech Construction partnered with state engineers to expand a dual-carriage bridge section along the Lagos-Ibadan Expressway. The project aimed to reduce congestion and improve safety for commuters.

  • Client Federal Ministry of Works and Housing
  • Project Type Infrastructure & Highway Bridge Expansion
  • Start Date: Sept 2020
  • End Date: April 2024
  • Status Completed
OUR WATCH WORD IS EXCELLENCE

The Challenge of Projects

Working on a live highway required strategic planning and phased execution. The team worked mostly at night to minimize disruption, facing weather delays and heavy equipment transport limitations due to ongoing traffic. Despite these, our engineers maintained safety, quality, and timeline discipline.

Project Requirements

  • Bridge structural assessment and redesign.
  • Reinforced concrete casting.
  • Hydraulic channel improvement.
  • Traffic management during construction.

A durable 4-lane bridge was successfully delivered, improving traffic flow and reducing travel time by up to 30%.

Project Results

The expanded bridge section now allows for smoother traffic movement, reducing congestion and travel time by approximately 30%. Structural integrity was verified and certified by independent engineers, and the project earned commendations from both the Federal Ministry of Works and motorist associations.